Infrastructure
Server Rooms, Network Cabinets & Power in Edmonton
The closet holding your network equipment is hot, crowded, and one power problem away from trouble.
Equipment spaces that are safer to maintain
PIERTEC reviews the physical setup behind your IT: server spaces, racks, power protection, and cooling. We help Edmonton businesses make equipment spaces safer to maintain and easier to expand.
Does Your Equipment Room Look Like This?
These problems do not appear on a computer screen until equipment starts to fail.
A floor fan runs all summer beside the server rack
The room gets hot every afternoon, and nobody knows if the equipment stays cool.
A power bar feeds several network boxes
Staff keep adding plugs, but no one has checked the power load or protection.
Boxes are piled in front of the cabinet
A technician cannot reach the network switch without first clearing storage supplies.
An equipment cabinet has no room to grow
The next switch has nowhere to go, so it ends up on a shelf.
Nobody can find the equipment cabinet key
A repair visit stops because the only key went home with a former supervisor.
What Is Physical Plant?
Physical Plant is the space and equipment that keeps business technology running. It includes network cabinets, server rooms, shelves, cable routes, power protection, airflow, and access to the equipment.
An office does not need a large server room to have physical IT problems. A small network cabinet in a hot storage room can create daily trouble too.
PIERTEC reviews the IT requirements and plans how equipment should be placed. Electrical and building work belongs with the qualified trades who are licensed for that work.
How We Review and Improve the Space
Five steps, in this order.
Look at the Room With You
We ask where the equipment lives, which systems it feeds, and what makes servicing the space difficult. We arrange a visit or suitable review.
Check Layout and Access
We look at cabinet space, cable entry, equipment mounting, and whether a technician can reach what needs servicing.
Review Power and Cooling Needs
We identify where heat, poor airflow, or weak power protection needs attention. Qualified trades assess and complete regulated building work.
Plan the Improvements
We set out equipment moves, cabinet changes, and work that needs a cabling, electrical, or HVAC contractor.
Check the Finished Setup
After approved work, we walk through equipment access, connection layout, and basic operation so future service visits are easier.
Equipment room review
A list of conditions affecting server and network equipment.
Rack and cabinet plan
An organized layout for equipment, service access, and space for additions.
Power protection recommendations
UPS needs, shutdown plans, and power concerns for a qualified electrician.
Cooling and ventilation needs
Notes on heat and airflow that the building team or HVAC contractor can use.
Improvement sequence
Changes to make first, with separate work marked for suppliers or trades.
The Tools We Use
Three of the tools behind Physical Plant. Select one to see how we use it.
[DRAFT COPY] Written from the November 18 call. PIERTEC to confirm how each tool is used.
See all our tools →
How we use it
We install and manage Fortinet firewalls to protect your office network. Our technicians are trained and certified to work on this equipment. [CERTIFICATION]
How we use it
We use Ubiquiti equipment for dependable office Wi-Fi and wired networks. Each one is set up so staff, guests and devices connect only where they should.
How we use it
We supply Lenovo computers and laptops, and set each one up to your standards before it reaches your staff. A new hire can open it and start on day one.
Why Choose PIERTEC?
Less guessing. Better records. A clear next step.
IT has a way of spreading across people, buildings, and suppliers. PIERTEC puts the pieces in one place so your team knows what it has and who looks after it.
Talk to an IT AdvisorEdmonton roots since 2006
PIERTEC began in Edmonton in 2006. We work best with teams of about 20 to 80 people who rely on IT every day but do not need a large in-house department.
We bring order to your IT
Renewals get buried in inboxes, and every office approves software its own way. We record the details, set clear standards, and track what is due next.
Start with a single project
Many clients first hired PIERTEC for a single job. Some added services once the team knew their systems. Begin with the work that needs doing now.
One team, one conversation
PIERTEC covers IT advice, ongoing management, and the equipment behind your network. You get one place to raise a problem and plan the next step.
Do we need a dedicated server room?
Not always. Some offices only need a properly placed, accessible network cabinet. The answer depends on the equipment, heat, power, and security needs.
Can PIERTEC install electrical outlets or cooling equipment?
Electrical and HVAC work is done by the appropriate qualified trade. PIERTEC identifies the IT requirements and [CONFIRM: does PIERTEC coordinate those contractors directly?].
What if we lease the building?
We work with the space you have and flag changes that need the landlord or building manager to approve.
Will we have to shut down the network?
An assessment normally does not require an outage. Moving active equipment may require a booked service window.
What does this type of project cost?
The cost comes from the space, equipment changes, and any outside trade work. PIERTEC identifies the IT work and the other costs before work begins.
Make the Equipment Space Easier to Maintain
If your network cabinet or server room has become an afterthought, PIERTEC will review the setup and map out the changes that matter.
Book an Equipment Room Review